Project Pictures

Starbaord Water Tank (Before)
Starbaord Water Tank (Before)
Starbaord Water Tank (After)
Starbaord Water Tank (After)
Starbaord Water Tank (Before)
Starbaord Water Tank (After)
Port Side Water Tank (After)
Distilled Water Tank (Before)
Distilled Water Tank (Before)
Distilled Water Tank (After)
Distilled Water Tank (Before)
Processing Power Maintenance (MPI, Blasting & Painting)
MPI ON TUG BOAT BOTTOM PLATE (PRINCES GOGOBA) AT ELSHCON FABRICATION
ULTRASONIC SHEAR WEAVES ON 36” NLNG GAS PIPELINE
SLING WIRE INSPECTION
Metering Unit Maintenance (MPI, Blasting & Painting)
SHACKLES INSPECTION
LOAD TEST ON DUMMY RISER
CARRIER BASKET INSPECTION
HELIPAD REPAIRS (BLASTING & PAINTING)
CONTAINER INSPECTION
MAGNETIC PARTICLE INSPECTION (MPI) ON 36” NLNG GAS LINE
CHAINBLOCK INSPECTION